[1] Chutima, P., Chimklai, P. (2012). “Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge”, Computers & Industrial Engineering, 62(1): 39-55.
[2] Bartholdi, J. (1993). “Balancing two-sided assembly lines: a case study”, International Journal of Production Research, 31(10): 2447-2461.
[3] Lee, T.O., Kim, Y., Kim, Y.K. (2001). “Two-sided assembly line balancing to maximize work relatedness and slackness”, Computers & Industrial Engineering, 40(3): 273-292.
[4] Boysen, N., Fliedner, M., Scholl, A. (2009). “Sequencing mixed-model assembly lines: Survey, classification and model critique”, European Journal of Operational Research, 192(2): 349-373.
[5] Scholl, A., Becker, C. (2006). “State-of-the-art exact and heuristic solution procedures for simple assembly line balancing”. European Journal of Operational Research, 168(3): 666-693.
[6] Boysen, N., Fliedner, M., Scholl, A. (2007). “A classification of assembly line balancing problems”, European journal of operational research, 183(2): 674-693.
[7] Tasan, S. O., Tunali, S. (2008). “A review of the current applications of genetic algorithms in assembly line balancing”, Journal of intelligent manufacturing, 19(1): 49-69.
[8] Wu, E.-F. et al. (2008). “A branch-and-bound algorithm for two-sided assembly line balancing”, The International Journal of Advanced Manufacturing Technology, 39(9-10): 1009-1015.
[9] Xiaofeng, H., et al. (2010). “A branch-and-bound algorithm to minimize the line length of a two-sided assembly line”, European Journal of Operational Research, 206(3): 703-707.
[10] Özcan, U., Toklu, B. (2010). “Balancing two-sided assembly lines with sequence-dependent setup times”, International Journal of Production Research, 48(18): 5363-5383.
[11] Özcan, U. (2010). “Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm”. European Journal of Operational Research, 205(1): 81-97.
[12] Lapierre, S.D., Ruiz, A.B. (2004). “Balancing assembly lines: an industrial case study”, Journal of the Operational Research Society, 55(6): 589-597.
[13] Baykasoglu, A., Dereli, T. (2008). “Two-sided assembly line balancing using an ant-colony-based heuristic”, The International Journal of Advanced Manufacturing Technology, 36(5-6): 582-588.
[14] Özbakır, L., Tapkan, P. (2011). “Bee colony intelligence in zone constrained two-sided assembly line balancing problem”, Expert Systems with Applications, 38(9): 11947-11957.
[15] Simaria, A.S., Vilarinho, P.M. (2009). “2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines”, Computers & Industrial Engineering, 56(2): 489-506.
[16] Rabbani, M., Moghaddam, M., Manavizadeh, N. (2012). “Balancing of mixed-model two-sided assembly lines with multiple U-shaped layout”, The International Journal of Advanced Manufacturing Technology, 59(9-12): 1191-1210.
[17] Özcan, U., Toklu, B. (2009). “Balancing of mixed-model two-sided assembly lines”, Computers & Industrial Engineering, 57(1): 217-227.
[18] Yuan, B. et al. (2015). “An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines”. Computers & Operations Research, 53: 32-41.
[19] طسوجی حسنپور، سعید، امین ناصری، محمدرضا و آدرسی، ابوالفضل. (1395). "حل مسئله زمانبندی جریان کارگاهی برگشت پذیر بدون وقفه". نشریه پژوهش های مهندسی صنایع در سیستمهای تولید. دوره 4، شماره 9: 279-271.
[20] اسکندری، حمیدرضا و بهرامی، محمد. (1396). "زمان بندی چندهدفه اتاق عمل با استفاده از بهینه سازی مبتنی بر شبیه سازی". نشریه مهندسی صنایع (دانشکده فنی دانشگاه تهران)، دوره 51، شماره 1: 1-13.