[1] Shirazi, R., Frizelle, G., (2001). “Minimizing the number of tool switches on a flexible machine: an empirical study”, International Journal of Production Research, 39(15): 3547-3560.
[2] Tang, C.S., Denardo, E.V., (1988). “Models arising from a flexible manufacturing machine, part I: minimization of the number of tool switches”, Operations research, 36(5): 767-777.
[3] Crama, Y., Oerlemans, A.G., Spieksma, F.C., (1996). “Minimizing the number of tool switches on a flexible machine”, Springer.
[4] Privault, C., Finke, G., (1995). “Modelling a tool switching problem on a single NC-machine. Journal of Intelligent Manufacturing”, 6(2): 87-94.
[5] Hertz, A., Laporte, G., Mittaz, M., Stecke, K.E., (1998). “Heuristics for minimizing tool switches when scheduling part types on a flexible machine”, IIE transactions, 30(8): 689-694.
[6] Al-Fawzan, M., Al-Sultan, K., (2003). “A tabu search based algorithm for minimizing the number of tool switches on a flexible machine”, Computers & industrial engineering, 44(1): 35-47.
[7] Akturk, M.S., Ghosh, J.B., Gunes, E.D., (2003). “Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance”, Naval Research Logistics (NRL), 50(1): 15-30.
[8] Laporte, G., Salazar-Gonzalez, J.J., Semet, F., (2004). “Exact algorithms for the job sequencing and tool switching problem”, IIE transactions, 36(1): 37-45.
[9] Zhou, B.H., Xi, L.F., Cao, Y.S., (2005). “A beam-search-based algorithm for the tool switching problem on a flexible machine”, The International Journal of Advanced Manufacturing Technology, 25(9-10): 876-882.
[10] Crama, Y., Moonen, L.S., Spieksma, F.C., Talloen, E., (2007). “The tool switching problem revisited”, European Journal of Operational Research, 182(2): 952-957.
[11] Konak, A., Kulturel-Konak, S., Azizoğlu, M., (2008). “Minimizing the number of tool switching instants in Flexible Manufacturing Systems”, International Journal of Production Economics, 116(2): 298-307.
[12] Yanasse, H.H., Rodrigues, R.d.C.M., Senne, E.L.F., (2009). “An enumeration algorithm based on partial ordering to solve the minimization of tool switches problem”, Gestão & Produção, 16(3): 370-381.
[13] Amaya, J.E., Cotta, C., Fernández-Leiva, A.J., (2012). “Solving the tool switching problem with memetic algorithms, Artificial Intelligence for Engineering Design”, Analysis and Manufacturing, 26(02): 221-235.
[14] Catanzaro, D., Gouveia, L., Labbé, M., (2015). “Improved integer linear programming formulations for the job Sequencing and tool Switching Problem”, European Journal of Operational Research, 244(3): 766-777.
[15] Chaves, A., Lorena, L., Senne, E., Resende, M., (2015). “Hybrid method with CS and BRKGA applied to the minimization of tool switches problem”, Computers & Operations Research.
[16] Sethi, S.P., Sriskandarajah, C., Sorger, G., Blazewicz, J., Kubiak, W., (1992). “Sequencing of parts and robot moves in a robotic cell”, International Journal of Flexible Manufacturing Systems, 4(3-4): 331-358.
[17] Zarandi, M.F., Mosadegh, H., Fattahi, M., (2013). “Two-machine robotic cell scheduling problem with sequence-dependent setup times”, Computers & Operations Research, 40(5): 1420-1434.
[18] Al-Ahmari, A., (2016). “Optimal robotic cell scheduling with controllers using mathematically based timed Petri nets. Information Sciences”, 329: 638-648.
[19] Gultekin, H., Akturk, M.S., Karasan, O.E., (2006). “Cyclic scheduling of a 2-machine robotic cell with tooling constraints”, European Journal of Operational Research, 174(2): 777-796.
[20] Abadi, I.K., Gholami, S., (2009). “Robot Movements in a Cyclic Multiple-Part Type Three-Machine Flexible Robotic Cell Problem”, Transactions E: Industrial Engineering, 16: 36-54.
[21] Fathian, M., Kamalabadi, I.N., Heydari, M., Farughi, H., (2011). “A Petri net model for part sequencing and robot moves sequence in a 2-machine robotic cell”, Journal of Software Engineering and Applications, 4(11): 603-614.
[22] Crama, Y., Kats, V., Van de Klundert, J., Levner, E., (2000). “Cyclic scheduling in robotic flowshops”, Annals of operations Research, 96(1-4): 97-124.
[23] Sethi Sethi, S.P., Sriskandarajah, C., Sorger, G., Blazewicz, J., Kubiak, W., (1992). “Sequencing of parts and robot moves in a robotic cell”, International Journal of Flexible Manufacturing Systems, 4(3-4): 331-358.
[24] Farughi, H., Dolatabadiaa, M., Moradi, V., Karbasi, v., Mostafayi, S., (2017). “Minimizing the number of tool switches in flexible manufacturing cells subject to tools reliability using genetic algorithm”, Journal of Industrial and Systems Engineering, 10(1): 17-33.
[25] فخرزاد، محمدباقر، علینژاد، اسماعیل. (1392). «برنامهریزی و زمانبندی پیشرفته با در نظر گرفتن اثر یادگیری در سیستمهای ساخت کارگاهی انعطافپذیر». نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید، 1(1): 13-24.
[26] Holland, J.H., “Adaptation in natural and artificial systems: an introductory analysis with applications to biology”, Control and artificial intelligence. 1992: MIT press.
[27] Roy, R., (1990). “A Primer on the Taguchi Method, Society of Manufacturing Engineers. Ann Arbor, Mich, USA.