[1] Pinedo, M., (2015). Scheduling, Springer.
[2] Hosseinzadeh, M., Sahraeian, R., (2017). “Solving a Multi-Agent Scheduling Problem in a Flow Shop Environment Considering Rejection and Deteriorating Jobs Using a Meta-Heuristic Algorithm”, Journal of Industrial Engineering Research in Production Systems, 5(10): 17-29.
[3] Chang, Y.C., Li, V.C., Chiang, C.J., (2014). “An ant colony optimization heuristic for an integrated production and distribution scheduling problem”, Engineering Optimization, 46(4): 503-520.
[4] Sarmiento, A.M., Nagi, R., (1999). “A Review of Integrated Analysis of Production–Distribution Systems”, IIE Transactions, 31(11): 1061-1074.
[5] Cóccola, M.E., Zamarripa, M., Méndez, C.A., Espu˜na, A., (2013). “Toward integrated production and distribution management in multi-echelon”, Computers and Chemical Engineering 57: 78-94.
[6] Hall, N.G., Potts, C.N., (2003). “Supply chain scheduling: Batching and delivery”, Operations Research, 51: 566-584.
[7] Chen, H.K., Hsueh, C.F., Chang, M.S., (2008). “Production scheduling and vehicle routing with time windows for perishable food products”, Computers & Operations Research, 36: 2311-2319.
[8] Chen, Z.L., (2010). “Integrated Production and Outbound Distribution Scheduling: Review and Extensions”, Operations Research 58(1): 130-148.
[9] Garcia, J.M., Smith, K., Lozano, S., Guerrero, F., (2002). “A comparison of GRASP and an exact method for solving a production and delivery scheduling problem”, Advances in Soft Computing, Physica, (14): 431-447.
[10] Garcia, J.M., Lozano, S., Canca. D., (2004). “Coordinated scheduling of production and delivery from multiple plants”, Robotics and Computer-Integrated Manufacturing, 20 (3): 191-198.
[11] Chang, Y.C., Lee, C.Y., (2004). “Machine scheduling with job delivery coordination”, European Journal of Operational Research, 158 (2): 470-487.
[12] Chen, Z.L., Vairaktarakis, G.L., (2005). “Integrated scheduling of production and distribution operations”, Management Science, 51 (4): 614-628.
[13] Li, C.L., Vairaktarakis, G.L., (2007). “Coordinating production and distribution of jobs with bundling operations”, IIE Transactions, 39 (2): 203-215.
[14] Khodabandeh, M., Hejazi, S.R., Rasti-Barzoki, M., (2014). “A Genetic Algorithm for an Integrated Production and Distribution Scheduling Problem with VRP”, Journal of Industrial Engineering Research in Production Systems, 1(2): 167-181.
[15] Ullrich C.A., (2013). “Integrated machine scheduling and vehicle routing with time windows”, European Journal of Operational Research, 227: 152-165.
[16] Amorim, P., Belo-Filho, M.A.F., Toledo, F.M.B., Almeder, C., Almada-Lobo, B., (2013). “Lot sizing versus batching in the production and distribution planning of perishable goods”, International Journal of Production Economics, 146: 208-218.
[17] Chang, Y.C., Chang, K.H. Chang, T.K. (2013). “Applied column generation-based approach to solve supply chain scheduling problems”, International Journal of Production Research, 51 (13): 4070-4086.
[18] Chang, Y.C., Li, V.C., Chiang, C.J., (2014). “An ant colony optimization heuristic for an integrated production and distribution scheduling problem”, Engineering Optimization, 46(4): 503-520.
[19] Belo-Filho, M.A.F., Amorim, P., Almada-Lobo. (2015). “An adaptive large neighbor-hood search for the operational integrated production and distribution problem of perishable products”, International Journal of Production Research, 53 (20): 6040-6058.
[20] Li, K., Zhou, C., Leung, Y.T.J., Ma, Y., (2016). “Integrated production and delivery with single machine and multiple vehicles”, Expert Systems with Applications,
57: 12-20.
[21] Devapriya, P., Ferrell, W., Geismar, N., (2017). “Integrated Production and Distribution Scheduling with a Perishable Product”, European Journal of Operational Research,
259(3): 906-916.
[22] Chang, P.C., Chen, SH., Mani, V., (2009). “A hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penalties”, Applied Mathematical Modelling, 33: 579-596.
[23] Chang, P.C., Chen, S.H., (2011). “Integrating dominance properties with genetic algorithms for parallel machine scheduling problems with setup times”, Applied Soft Computing, 11: 1263-1274.
[24] Ahmadizar, F., Hosseini, L., (2012). “Bi-criteria single machine scheduling with a time- dependent learning effect and release times”, Applied Mathematical Modelling, 36(62): 6203-6214.
[25] Ahmadizar, F., Amiri, Z., (2018). “Outsourcing and scheduling for a two-machine flow shop with release times”, Engineering Optimization, 50(3): 483-498.
[26] Atashpaz-Gargari, E., Lucas, C., (2007). “Imperialist competitive algorithm: an algorithm for optimization inspired by imperialistic competition”, IEEE Congress on Evolutionary Computation, singapore: 4661-4667.
[27] Atashpaz Gargari, E., Hashemzadeh, F., Rajabioun, R., Lucas, C., (2008). “Colonial competitive algorithm: A novel approach for PID controller design in MIMO distillation column process”, International Journal of Intelligent Computing and Cybernetics (IJICC), 1(3): 337-355.
[28] Behnamian, J., Zandieh, M., (2001). “A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties”, Expert Systems with Applications, 38: 14490-14498.
[29] Ahmadizar, F., Farhadi, S., (2015). “Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs”, Computers &OperationsResearch, 53: 194-205.
[30] Hosseini, S.M., Al Khaled, A., (2014). “A survey on the Imperialist Competitive Algorithm meta-heuristic: Implementation in engineering domain and directions for future research”, Applied Soft Computing, 24: 1078-1094.
[31] Shokrollahpour, E., Zandieh, M., Dorri, B., (2011). “A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem”, International Journal of Production Research, 49:3087-103.
Haase, K., Kimms, A., (2000). “Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities”, International Journal of Production Economics, 66: 159-169.