[1] Acosta-Mejia, C. & Pignatiello Jr, J. J., (2010). “The run sum R chart with fast initial response”. Communications in Statistics Simulation and Computations, 39(5),921-932. https://doi.org/10.1080/03610911003663899.
[2] Teoh, W. L. & Khoo, M. B. C., (2012). “A study on the run sum control chart with unknown parameters”. In AIP Conference Proceedings, (Vol. 1482, No. 1, pp. 357-362). https://doi.org/10.1063/1.4757494.
[3] Sitt, C. K., Khoo, M. B. C., Shamsuzzaman, M. & Chen, C. H., (2014). “The run sum t control chart for monitoring process mean changes in manufacturing”. The International Journal of Advanced Manufacturing Technology, 70(5),1487-1504. https://doi.org/10.1007/s00170-013-5333-y.
[4] Chew, X. Y., Khoo, M. B. C., Teh, S. Y. & Castagliola, P., (2015). “The variable sampling interval run sum control chart”. Computers & Industrial Engineering, 90, 25-38. https://doi.org/10.1016/j.cie.2015.08.015.
[5] Rakitzis, A. C. & Antzoulakos, D. L., (2016). “Run sum control charts for the monitoring of process variability”. Quality Technology & Quantitative Management, 13(1),58-77. https://doi.org/10.1080/16843703.2016.1139842.
[6] Saha, S., Khoo, M. B. C., Teoh, W. L. & Lee, M. H., (2017). “Run sum control chart with estimated process parameters”. Quality and Reliability Engineering International, 33(8),1885-1899. https://doi.org/10.1002/qre.2153.
[7] Gao, H., Khoo, M. B. C., Teh, S. Y. & Teoh, W. L., (2019). “A study on the median run length performance of the run sum S control chart”. International Journal of Mechanical Engineering and Robotics Research, 8(6), 885-890. https://doi.org/ 10.18178/ijmerr.8.6.885-890.
[8] Saha, S., Khoo, M. B. C., Ng, P. S. & Khatun, M., (2018). “Variable sampling interval run sum chart with estimated process parameters”. In MATEC Web of Conferences (Vol. 192, p. 01012). https://doi.org/10.1051/matecconf/201819201012.
[9] Antzoulakos, D. L., Fountoukidis, K. G. & Rakitzis, A. C., (2023). “A phase II run sum chart for monitoring process mean and variability”. Journal of Statistical Computation and Simulation, 93(13), 2276-2296. https://doi.org/10.1080/00949655.2023.2178652.
[10] Mim, F. N., Khoo, M. B. C., Saha, S. & Haq, A., (2022). “New run sum t charts with variable sampling intervals for process mean”. Communications in Statistics Simulation and Computation, 51(9), 5350-5372. https://doi.org/10.1080/03610918.2020.1770285.
[11] Antzoulakos, D. L., Fountoukidis, K. G. & Rakitzis, A. C., (2025). “The variable sample size and sampling interval run sum Max chart”. Quality Technology & Quantitative Management, 22(2), 321-344. https://doi.org/10.1080/16843703.2024.2315837.
[12] Yeong, W. C., Lim, S. L., Khoo, M. B., Ng, P. S. & Chong, Z. L., (2022). “A variable sampling interval run sum chart for the coefficient of variation”. Journal of Statistical Computation and Simulation, 92(15),3150-3166. https://doi.org/10.1080/00949655.2022.2061486.
[13] Antzoulakos, D. L., Fountoukidis, K. G. & Rakitzis, A. C., (2025). “A Max‐type Run Sum Chart for Monitoring a Shifted Exponential Process”. Published online in Quality and Reliability Engineering International, https://doi.org/10.1002/qre.3773.
[14] Khoo, M. B. C., Sitt, C. K., Zhang, W. & Castagliola, P., (2013). “A run sum Hotelling’s χ2 control chart”. Computers & Industrial Engineering, 64, 686–695. https://doi.org/10.1016/j.cie.2012.11.008.
[15] Chew, X. Y., Khoo, M. B. C., Teh, S. Y. & Lee, M. H., (2016). “The run sum Hotelling's χ2 control chart with variable sampling intervals”. Quality and Reliability Engineering International, 32(7), 2573-2590.
https://doi.org/10.1002/qre.1960.
[16] Abubakar, S. S., Khoo, M. B. C., Saha, S. & Teoh, W. L., (2022). “Run sum control chart for monitoring the ratio of population means of a bivariate normal distribution”. Communications in Statistics-Theory and Methods, 51(13), 4559-4588. https://doi.org/10.1080/03610926.2020.1818099.
[17] Hemmati, M., Amiri, A. & Jalilibal, Z., (2022). “Design of multivariate run sum control chart for monitoring coefficient of variation in the presence of measurement error”. Sharif Industrial Engineering and Management, 1-38, 1,111-117.
https://doi.org/10.24200/j65.2021.58429.2232. [InPersian].
[18] Saha, S., Khoo, M. B. C., Babatunde, O. T., Teh, S. Y. & Teoh, W. L., (2025). “Run Sum Hotelling's Chart for Autocorrelated processes”. Published online in Quality and Reliability Engineering International.
https://doi.org/10.1002/qre.3775.
[19] میربیک، حمیدرضا، برادران کاظم زاده، رضا و امیری، امیرحسین، (1395). تخمین نقطه تغییر پلهای در پایش پروفایلهای خطی سادهی خودهمبسته با استفاده از روشهای ماکزیمم درستنمایی و خوشه بندی. نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید، 4(7)، 37-47.
https://doi.org/10.22084/ier.2016.1567.
[20] قاسمی، زهره و احمدی یزدی، احمد، (1404). نمودارهای کنترلی MHWMA برای پایش پروفایل خطی چندگانه چندمتغیره. نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید، 13(26)، 183-197.
https://doi.org/10.22084/ier.2025.31437.2211.
[21] ستوده، امین، امیری، امیرحسین، ملکی، محمدرضا و جمشیدی، سینا، (1402). طراحی نمودارهای کنترل میانگین پیشرونده برای پایش پروفایلهای خطی ساده چندمتغیره در فاز ۲. مهندسی صنایع و مدیریت، 39 (2)، 99-108. https://doi.org/10.24200/J65.2020.60203.229
[22] Sherwani, R. A. K., Qasim, H., Abbas, S., Abbas, T. & Aslam, M., (2023). “Performance evaluation of DEWMA3 in phase-II for capturing changes in simple linear profiles based on run rule mechanism”. Scientific Reports, 13(1), 8609. https://doi.org/10.1038/s41598-023-35779-0.
[23] Ghasemi, Z., Yazdi, A. A., & Zeinal Hamadani, A., (2025). “New methods for phase II monitoring of multivariate multiple linear profiles”. Quality and Reliability Engineering International, 41(5), 2093-2110. https://doi.org/10.1002/qre.3756