Main Subjects = Heuristic methods in production systems
Bi-Objective Optimization for a Location-Routing Problem with Reliability and Fuzzy Cost

Volume 4, Issue 8, February 2017, Pages 133-145

10.22084/ier.2017.1699

Najmeh Bahrampour; Reza Tavakkoli-Moghaddam; Nasser Shahsavari pour


Rescheduling of Three-stage Supply Chain with a Focus on Integration of the Stages

Volume 3, Issue 6, February 2016, Pages 191-205

Mohammad Ali Beheshtinia; Isa Akbari


Two-dimensional loading time-dependent vehicle routing problem: mathematical modeling and solving approaches

Volume 3, Issue 5, September 2015, Pages 43-59

Mohammad Said Sabbagh; Mehdi Alinaghian; Komail Zamanloo


A Novel Heuristic Approach to Simplify Initial Graph of Maximum Flow Problem

Volume 3, Issue 5, September 2015, Pages 107-119

Vahid Khodakarami; Vahid Hajipour; Mohammad Reza Hassani


Developing Hub Location Problem Based on Economy Flows by Using Capacity of Vehicle and Limitation of Entrance Flow to Hub

Volume 2, Issue 4, March 2015, Pages 1-19

Seyed Kamal Charsooghi; Farid Momayyezi; Amin Yazekhasti


A Mixed Integer Nonlinear Programming Model for Order Replenishment and a Heuristic Algorithm for its Solution

Volume 2, Issue 3, September 2014, Pages 63-75

Reza Baradaran kazemzadeh; zohreh kaheh; Ellips Masehian


Hybird hyper PSO algorithm for distributed factories scheduling with virtual corporation

Volume 1, Issue 1, July 2013, Pages 1-11

J. Behnamian; S.M.T. Fatemi Ghomi