[1] Tang, L., Luh, P.B., Liu, J., Yang, Z., (2002). “Steel-making process scheduling using Lagrangian relaxation”, International Journal of Production Research, 40(1) :55-70.
[2] Okano, H., Davenport, A.J., Trumbo, M., Reddy, C., Yoda, K., Amano, M., (2004). “Finishing line scheduling in the steel industry”, IBM Journal of Research and Development, 48(5/6): 811–830.
[3] Wang, D.D., Tieu, A.K., Boer de, F.G., Ma, B., Yuen, W.Y.D., (2000). “Toward a heuristic optimum design of rolling schedules for tandem cold rolling mills”, Engineering Application of Artificial Intelligence, 13(4): 397–406.
[4] Protmann, M.C., Rohr, D., (1995). “Hierarchical production management applied to an iron and steel industry”, Journal of Intelligent Manufacturing, 6(2): 79-85,.
[5] Chen, M., Wang, W., (1997). “A linear programming model for integrated steel production and distribution planning”, International Journal of Operation and Production Management, 17(6): 592-610.
[6] Jacobs, T.L., Wright, J.R., Cobbs, A.E., (1988). “Optimal inter-process steel production scheduling”, Computers and Operation Research, 15(6): 497-507,.
[7] Lopez, L., Carter, M.W., Gendreau, M., (1998). “The hot strip mill Production scheduling problem: a tabu search approach”, European Journal of Operational Research, 106: 317-335,.
[8] Tang, L., Liu, J., Rong, A., Yang, Z., (2000). “A mathematical programming model for scheduling steelmaking continuous casting production”, European Journal of Operational Research, 120(2): 423-435.
[9] Chen, X.,Wu, Q., (2002). “Formulating the steel scheduling problem as a TSPTW”, Intell Contr.Automat, 3: 1744-1748.
[10] Tang, L., Liu, J., Rong, A., Yang, Z., (2000). “A multiple travelling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron and Steel Complex”, European Journal of Operational Research, 124(2): 267-282.
[11] Cowling, P.I., Rezig, W., (2000). “Integration of continuous caster and hot strip mill planning for steel production”, Journal of Scheduling, 3(4): 185-208.
[12] Yadollahpour, M.R., Bijari, M., Kavosh, S., Mahnam, M., (2009). “Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling”, International Journal of Advanced Manufacturing Technology, 45: 1215-1231.
[13] Tang, L., Wang, X., (2009). “Simultaneously scheduling multiple turns for steel color-coating production”, European Journal of Operational Research, 198(3): 715-725.
[14] Tang, L., Yang, Y., Liu, J., (2010). “An efficient optimal solution to the coilsequencing problem in electro-galvanizing line”, Computers & Operations Research, 38(1): 1780-1796.
[15] فخرزاد، م. ب.، علی نژاد، ا.، (1392)، "برنامهریزی و زمانبندی پیشرفته با در نظر گرفتن اثر یادگیری در سیستمهای ساخت کارگاهی انعطافپذیر"، نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید 1(1): 13-24.
[16] باقری نژاد، ج.، قهقایی، آ.، (1395)، "تحلیل سیستم تولیدی MTS/MTO با مدلسازی صف مبتنی بر ورود گروهی پواسون و سرویس ارلنگ"، نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید 4(7): 69-79.