An Efficient Heuristic Algorithm for Pickling Line in Esfahan's Mobarakeh Steel Company

Document Type : Research Paper

Authors

Abstract

Reducing production costs has become one of the most important concerns, due to the economic development and increasing competitiveness in industries. To achieve this goal, considering real conditions is important. In this presentation, we investigate the production scheduling of a Pickling Line in Esfahan's Mobarakeh Steel Company called Pickling Line Scheduling (PLS). The problem is to generate multiple production turns for the Pickling Line coils and at the same time determine the sequence of these turns and select coils then the sequence coils of these turn so that the productivity and product quality both maximized while the production cost minimized. We formulate this problem as a mixed integer nonlinear program and propose a heuristic algorithm to obtain satisfactory solutions. Results on real production instances show heuristic algorithm is more effective and efficient with comparison to manual scheduling in Esfahan's Mobarakeh Steel Company.     

Keywords

Main Subjects


[1]     Tang, L., Luh, P.B., Liu, J., Yang, Z., (2002). “Steel-making process scheduling using Lagrangian relaxation”, International Journal of Production Research, 40(1) :55-70.
[2]     Okano, H., Davenport, A.J., Trumbo, M., Reddy, C., Yoda, K., Amano, M., (2004). “Finishing line scheduling in the steel industry”, IBM Journal of Research and Development, 48(5/6): 811–830.
[3]     Wang, D.D., Tieu, A.K., Boer de, F.G., Ma, B., Yuen, W.Y.D., (2000). “Toward a heuristic optimum design of rolling schedules for tandem cold rolling mills”, Engineering Application of Artificial Intelligence, 13(4): 397–406.
[4]     Protmann, M.C., Rohr, D., (1995). “Hierarchical production management applied to an iron and steel industry”, Journal of Intelligent Manufacturing, 6(2): 79-85,.
[5]     Chen, M., Wang, W., (1997). “A linear programming model for integrated steel production and distribution planning”, International Journal of Operation and Production Management, 17(6): 592-610.
[6]     Jacobs, T.L., Wright, J.R., Cobbs, A.E., (1988). “Optimal inter-process steel production scheduling”, Computers and Operation Research, 15(6): 497-507,.
[7]     Lopez, L., Carter, M.W., Gendreau, M., (1998). “The hot strip mill Production scheduling problem: a tabu search approach”, European Journal of Operational Research, 106: 317-335,.
[8]     Tang, L., Liu, J., Rong, A., Yang, Z., (2000). “A mathematical programming model for scheduling steelmaking continuous casting production”, European Journal of Operational Research, 120(2): 423-435.
[9]     Chen, X.,Wu, Q., (2002). “Formulating the steel scheduling problem as a TSPTW”, Intell Contr.Automat, 3: 1744-1748.
[10] Tang, L., Liu, J., Rong, A., Yang, Z., (2000). “A multiple travelling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron and Steel Complex”, European Journal of Operational Research, 124(2): 267-282.
[11] Cowling, P.I., Rezig, W., (2000). “Integration of continuous caster and hot strip mill planning for steel production”, Journal of Scheduling, 3(4): 185-208.
[12] Yadollahpour, M.R., Bijari, M., Kavosh, S., Mahnam, M., (2009). “Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling”, International Journal of Advanced Manufacturing Technology, 45: 1215-1231.
[13] Tang, L., Wang, X., (2009). “Simultaneously scheduling multiple turns for steel color-coating production”, European Journal of Operational Research, 198(3): 715-725.
[14] Tang, L., Yang, Y., Liu, J., (2010). “An efficient optimal solution to the coilsequencing problem in electro-galvanizing line”, Computers & Operations Research, 38(1): 1780-1796.
[15]  فخرزاد، م. ب.، علی نژاد، ا.، (1392)، "برنامه‌ریزی و زمان‌بندی پیشرفته با در نظر گرفتن اثر یادگیری در سیستم‌های ساخت کارگاهی انعطاف‌پذیر"، نشریه پژوهش­های مهندسی صنایع در سیستم­های تولید 1(1): 13-24.
[16]  باقری نژاد، ج.، قهقایی، آ.، (1395)، "تحلیل سیستم تولیدی MTS/MTO با مدلسازی صف مبتنی بر ورود گروهی پواسون و سرویس ارلنگ"، نشریه پژوهش­های مهندسی صنایع در سیستم­های تولید 4(7): 69-79.