[1] کاتبی، علی؛ الماسیان، فریبرز؛ همامی، پیمان، (1398). زمانبندی پروژههای ساخت با منابع محدود (MRCPSP) با درنظر گرفتن عدم قطعیت در مدت زمان فعالیتها و تأخیرات، مهندسی سازه و ساخت، 6، 176–98.
[2] Cao, F., Servranckx, T., He, Z., Vanhoucke. M. (2025). A buffer allocation evolutionary algorithm for resource-constrained projects with activity clusters, Journal of Scheduling, 28: 483–511
[3] Wang A. (2019). A framework for assessing project vulnerability to crises, International Journal of Managing Projects in Business, 12: 1079 – 1096.
[4] Guo, N., Guo, P., Shang, J., Zhao, J. (2020). Project vulnerability analysis: A topological approach. Journal of the Operational Research Society, 71:1233–42.
[5] Aleksic, A., Puskaric, H., Tadic, D., Stefanovic, M. (2017). Project management issues: vulnerability management assessment. Kybernetes, 46: 1171-1188.
[6] Zarghami, SA., Gunawan, I., Corral de Zubielqui, G., Baroudi, B. (2020). Incorporation of resource reliability into critical chain project management buffer sizing. Int J Prod Res, 58: 6130-6144
[7] Goldratt EM. (1997). Critical Chain, The North River Press.
[8] Milat, M., Knezic, S., Sedlar, J. (2021). A new surrogate measure for resilient approach to construction scheduling. Procedia Comput. Science.,181:468-476.
[9] Chaari, T., Chaabane, S., Aissani, N., Trentesaux, D. (2014). Scheduling under uncertainty: Survey and research directions. International Conference on Advanced Logistics and Transport (ICALT), 229-234.
[10] Liu, H., Qu, S., Li, R., Razaa, H. (2021). Bi-objective robust project scheduling with resource constraints and flexible activity execution lists, Computers & Industrial Engineering, 156: 107288.
[11] پرچمی افرا، خیرخواه امیرسامان. (1402). ارائه الگوریتم آزادسازی لاگرانژ برای مسأله زمانبندی چندپروژهای با محدودیت منابع، برنامهریزی سفارشدهی و برنامهریزی تولید منابع مصرفی در زنجیره تامین پروژه محور. مجله تحقیق در عملیات در کاربردهای آن (ریاضی کاربردی)، 20:33-60.
[12] Talbot, F.B. (1982). resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case, Management Science, 28: 1197 – 1210.
[13] Artigues, C., Hartmann, S., Vanhoucke, M. (2026). Fifty years of research on resource-constrained project scheduling explored from different perspectives, European Journal of Operational Research, 328.
[14] Rodríguez-Ballesteros, S., Alcaraz, J., Anton-Sanchez, L. (2026). Multi-mode resource-constrained project scheduling problem with time-dependent resource costs and capacities: A bi-objective approach, Expert Systems with Applications, 306:130955.
[15] باقرزاده رحمانی، سارا، رضائیان، جواد، ابراهیمی، احمد. (1404). زمانبندی دوهدفه پروژهها با گروههای کاری چندمهارته، اثر یادگیری و زمانهای راهاندازی و پردازش وابسته به گروه کاری. نشـریه پـژوهـشهای مهنـدسـی صنــایع در سیستـمهـای تولیــد، 26:19–35.
[16] Khoshsirat, M., Mousavi, S.M. (2024). A new proactive and reactive approach for resource-constrained project scheduling problem under activity and resource disruption: a scenario-based robust optimization approach, Annals of Operations Research, 338:597–643
[17] Kobylański, P., Kuchta, D. (2007). A note on the paper by MA Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling, International Journal of Production Economics, 107: 496 – 501.
[18] Chtourou, H., Haouari, M. (2008). A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling, Computers & Industrial Engineering, 55: 183-194
[19] Hao, X., Lin, L., Gen, M. (2014). An effective multi-objective EDA for robust resource constrained project scheduling wih uncertain durations, Procedia Computer Science, 36: 571 – 578.
[20] Russell, M.M., Hsiang, S.M., Liu, M., Wambeke, B. (2014). Causes of time buffer and duration variation in construction project tasks: comparison of perception to reality, Journal of Construction Engineering and Management, 140: 04014016
[21] Bahnas, N., Adel, K., Khallaf, R., Elhakeem, A. (2024). Monitoring and controlling engineering projects with blockchain-based critical chain project management, Automation in Construction, 165: 105484
[22] She, B., Chen, B., Hall, N.G. (2021). Buffer sizing in critical chain project management by network decomposition, Omega, 102: 102382.
[23] Lotfi, R., Vaseei, M., Ali, S.S., Davoodi, S.M.R., Bazregar, M., Sadeghi, S. (2024). Budget allocation problem for projects with considering risks, robustness, resiliency, and sustainability requirements, Results in Engineering, 24:102828.
[24] Artigues, C., Michelon, P., Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling, European Journal of Operational Research, 149: 249 – 267.
[25] Policella, N. (2005). Scheduling with uncertainty: A proactive approach using partial order schedules, AI Communications, 18: 165 – 167.
[26] Liang, Y., Cui, N., Hu, X., Demeulemeester, E. (2020). The integration of resource allocation and time buffering for bi-objective robust project scheduling, International Journal of Production Research, 58: 3839 – 3854.
[27] Rohaninejad, M., Tavakkoli-Moghaddam, R., Vahedi-Nouri, B. (2015). Redundancy resource allocation for reliable project scheduling: A game-theoretical approach, Procedia Computer Science, 64: 265-273.
[28] Shariatmadari, M., Nahavandi, N. (2020). A new resource buffer insertion approach for proactive resource investment problem, Computers & Industrial Engineering, 146: 106582.
[29] Hu, X., Cui, N., Demeulemeester, E., Bie, L. (2016). Incorporation of activity sensitivity measures into buffer management to manage project schedule risk, European Journal of Operational Research, 249: 717 – 727.
[30] Li, H., & Demeulemeester, E. (2016). A genetic algorithm for the robust resource leveling problem. Journal of Scheduling, 19(1), 43-60
[31] Gwak, H. S., Bea, S. H., & Lee, D. E. (2018). Resource Leveling using Genetic Algorithm. Korean Journal of Construction Engineering and Management, 19(1), 3-13
[32] Liu, W., Zhang, J., Qu, C., & Zhang, H. (2024). Performance of Priority Rules for Finance-Based and Resource-Constrained Project Scheduling Heuristics. Journal of Construction Engineering and Management, 150(6), 04024047
[33] Li, C., Wang, F., & Chung, T. (2024). Multi-mode multi-skill resource-constrained project scheduling problem with differentiated professional capabilities. Journal of Project Management, 9(1), 27–44
[34] Kolisch, R., Sprecher, A. (1997). PSPLIB – A project scheduling problem library: OR software – ORSEP operations research software exchange program, European Journal of Operational Research, 96: 205 – 216.
[35] Jarboui, B., Damak, N., Siarry, P., Rebai, A. (2008). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems, Applied Mathematics and Computation, 195: 299 – 308.
[36] Shen, H., Li, X. (2013). Cooperative discrete particle swarms for multi-mode resource-constrained projects, 2013 IEEE 17th International Conference on Computer Supported Cooperative Work in Design (CSCWD), Whistler, BC, Canada: 31 – 36.
[37] Li, H., Zhang, H. (2013). Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints, Automation in Construction, 35: 431 – 438.
[38] de la Pisa, M.P., Molina, J.C., Eguía, I. (2024). Ant colony algorithms for minimizing costs in multi-mode resource constrained project scheduling problems with spatial constraints, International Journal of Industrial Engineering Computations, 15: 667 – 684.
[39] Geiger, M.J. (2017). A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem, European Journal of Operational Research, 256: 729 – 741.
[40] Damak, N., Jarboui, B., Siarry, P., Loukil, T. (2009). Differential evolution for solving multi-mode resource-constrained project scheduling problems, Computers & Operations Research, 36: 2653 – 2659.
[41] Song, Y., Vanhoucke, M. (2025). Schedule risk analysis for project control with risk interactions, Annals of Operations Research,1-56
[42] Kahraman, C., Onar, S.C. (2015). Intelligent techniques in engineering management, Springer.
[43] Zhu, J., Mostafavi, A. (2014). A system-of-systems framework for performance assessment in complex construction projects, Organization, Technology & Management in Construction: An International Journal, 6: 0.
[44] Shannon, C. E. (1948). A mathematical theory of communication. Bell System Technical Journal, 27(3), 379–423.
[45] Tavares, L.V., Antunes Ferreira, J.A., Silva Coelho, J. (1998). On the optimal management of project risk, European Journal of Operational Research, 107: 451 – 469.
[46] Trietsch, D., Mazmanyan, L., Gevorgyan, L., Baker, K.R. (2012). Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation, European Journal of Operational Research, 216: 386 – 396.
[47] Artigues, C., Roubellat, F. (2000). A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes, European Journal of Operational Research, 127: 297 – 316.
[48] Bartusch, M., Möhring, R.H., Radermacher, F.J. (1988). Scheduling project networks with resource constraints and time windows, Annals of Operations Research, 16: 199 – 240.