1
PhD student, Department of System Modeling and Data Analysis, Faculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran
2
Assistant Professor, Department of System Modeling and Data Analysis, Faculty of Industrial Engineering, K.N. Toosi University of Technology, Tehran, Iran.
In this paper, we try to provide a schedule for robotic cells in the event of a machine breakdown by using a proactive -reactive approach. We first develop a proactive model for a robotic m-machine cell under the condition of no disturbance. After the machine breakdown, we provide reactive programming in two time periods during the repair and after the repair of the broken machine. Finally, by stating the criteria of stability and Robustness in a robotic cell, we evaluate the efficiency of the presented model with a numerical example.
Vaisi, B., Farughi, H., & Raissi, S. (2018). Two-machine robotic cell sequencing under different uncertainties. Int. J. Simul. Model, 17, 284-294. https://doi.org/10.2507/IJSIMM17(2)434
Vaisi, B., Farughi, H., & Raissi, S. (2018). Bi-criteria robotic cell scheduling and operation allocation in the presence of break-downs. International journal of industrial engineering & production research, 29(3), 343-357..
Gultekin, H., Coban, B., & Akhlaghi, V. E. (2018). Cyclic scheduling of parts and robot moves in m-machine robotic cells. Computers & operations research, 90, 161-172. https://doi.org/10.1016/j.cor.2017.09.018
Yildiz, S., Akturk, M. S., & Karasan, O. E. (2011). Bicriteria robotic cell scheduling with controllable processing times. International Journal of Production Research, 49(2), 569-583. https://doi.org/10.1080/00207540903491799
Saedi, F., & Kianfar, K. (2023). Scheduling Cellular Manufacturing Systems Based on Human Factors and Due Date of Orders. Journal of Industrial Engineering Research in Production Systems, 10(21), 51-69. doi: 10.22084/ier.2023.27096.210. (in Persian).
Moradi, V., Yousefi Nejad Attari, M., & Farughi, H. (2018). Modeling for Minimizing Cycle Time in a three-Machine Robotic Cell with Assumption of Tool Switching. Journal of Industrial Engineering Research in Production Systems, 6(12), 1-17. doi: 10.22084/ier.2017.12669.1578. (in Persian).
Sethi, S.P. , Sriskandarajah, C. , Sorger, G. , Blazewicz, J. , Kubiak, W. (1992) . Sequencing of parts and robot moves in a robotic cell. Int. J. Flexible Manuf. Syst. 4 (3–4), 331–358. https://doi.org/10.1007/BF01324886
Kats, V., & Levner, E. (1997). A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling. Operations Research Letters, 21(4), 171-179. https://doi.org/10.1016/S0167-6377(97)00036-9
Hall, N. G., Kamoun, H., & Sriskandarajah, C. (1997). Scheduling in robotic cells: classification, two and three machine cells. Operations Research, 45(3), 421-439. https://doi.org/10.1287/opre.45.3.421
Crama, Y., & Van De Klundert, J. (1997). Cyclic scheduling of identical parts in a robotic cell. Operations Research, 45(6), 952-965. https://doi.org/10.1287/opre.45.6.952
Levner, E., Kats, V., & Levit, V. E. (1997). An improved algorithm for cyclic flowshop scheduling in a robotic cell. European Journal of Operational Research, 97(3), 500-508. https://doi.org/10.1016/S0377-2217(96)00272-X
Kats, V., Levner, E., & Meyzin, L. (1999). Multiple-part cyclic hoist scheduling using a sieve method. IEEE Transactions on Robotics and Automation, 15(4), 704-713. https://doi.org/10.1109/70.781993
Che, A., Zhou, Z., Chu, C., & Chen, H. (2011). Multi-degree cyclic hoist scheduling with time window constraints. International journal of production research, 49(19), 5679-5693. https://doi.org/10.1080/00207543.2010.503200
Zhou, Z., Che, A., & Yan, P. (2012). A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints. Applied Mathematical Modelling, 36(8), 3621-3629. https://doi.org/10.1016/j.apm.2011.10.032
Li, X., & Fung, R. Y. (2014). A mixed integer linear programming solution for single hoist multi-degree cyclic scheduling with reentrance. Engineering Optimization, 46(5), 704-723. https://doi.org/10.1080/0305215X.2013.795560
Elmi, A., & Topaloglu, S. (2016). Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization. Computers & Operations Research, 73, 67-83. https://doi.org/10.1016/j.cor.2016.03.007
Lee, J. H., & Kim, H. J. (2022). Reinforcement learning for robotic flow shop scheduling with processing time variations. International Journal of Production Research, 60(7), 2346-2368. https://doi.org/10.1080/00207543.2021.1887533
Che, A., Kats, V., & Levner, E. (2017). An efficient bicriteria algorithm for stable robotic flow shop scheduling. European Journal of Operational Research, 260(3), 964-971. https://doi.org/10.1016/j.ejor.2017.01.033
Kumar, S., Ramanan, N., & Sriskandarajah, C. (2005). Minimizing cycle time in large robotic cells. IIE Transactions, 37(2), 123-136 https://doi.org/10.1080/07408170590885279
Joo, Y. J. (2009). Operational optimization of an automated electrical die sorting line with single-wafer transfer. Master's thesis, Korea Advanced Institute of Science and Technology.
Wu, N., & Zhou, M. (2011). Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation. IEEE Transactions on Automation Science and Engineering, 9(1), 203-209. https://doi.org/10.1109/TASE.2011.2160452
Kim, H. J., Lee, J. H., & Lee, T. E. (2013). Noncyclic scheduling of cluster tools with a branch and bound algorithm. IEEE Transactions on Automation Science and Engineering, 12(2), 690-700. https://doi.org/10.1109/TASE.2013.2293552
Wu, X., Yuan, Q., & Wang, L. (2020). Multiobjective differential evolution algorithm for solving robotic cell scheduling problem with batch-processing machines. IEEE transactions on automation science and engineering, 18(2), 757-775. https://doi.org/10.1109/TASE.2020.2969469
Vaisi, B., Farughi, H., & Raissi, S. (2020). Schedule-allocate and robust sequencing in three-machine robotic cell under breakdowns. Mathematical problems in engineering, 2020, 1-24. https://doi.org/10.1155/2020/4597827
Kim, H. J., & Lee, J. H. (2021). Scheduling of dual-gripper robotic cells with reinforcement learning. IEEE transactions on automation science and engineering, 19(2), 1120-1136. https://doi.org/10.1109/TASE.2020.3047924
Zahrouni, W., & Kamoun, H. (2021). Scheduling in robotic cells with time window constraints. European journal of industrial engineering, 15(2), 206-225. https://doi.org/10.1504/EJIE.2021.114001
Ghadiri Nejad, M., Shavarani, S. M., Vizvári, B., & Barenji, R. V. (2018). Trade-off between process scheduling and production cost in cyclic flexible robotic cells. The international journal of advanced manufacturing technology, 96, 1081-1091. https://doi.org/10.1007/s00170-018-1577-x
Wang, Z., Zhou, B., Trentesaux, D., & Bekrar, A. (2017). Approximate optimal method for cyclic solutions in multi-robotic cell with processing time window. Robotics and autonomous systems, 98, 307-316. https://doi.org/10.1016/j.robot.2017.09.020
Majumder, A., & Laha, D. (2016). A new cuckoo search algorithm for 2-machine robotic cell scheduling problem with sequence-dependent setup times. Swarm and evolutionary computation, 28, 131-143. https://doi.org/10.1016/j.swevo.2016.02.001
Dawande, M., Geismar, H. N., Sethi, S. P., & Sriskandarajah, C. (2005). Sequencing and scheduling in robotic cells: Recent developments. Journal of Scheduling, 8(5), 387-426. https://doi.org/10.1007/s10951-005-2861-9
Kim, J. H., & Lee, T. E. (2008). Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net. IEEE Transactions on Automation Science and Engineering, 5(3), 490-503. https://doi.org/10.1109/TASE.2007.912716
Yoon, H. J., & Lee, D. Y. (2003, October). On-line scheduling of robotic cells with post-processing residency constraints. In SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme-System Security and Assurance (Cat. No. 03CH37483) (Vol. 3, pp. 2785-2790). IEEE. https://doi.org/10.1109/ICSMC.2003.1244307
Tonke, D., Grunow, M., & Akkerman, R. (2019). Robotic-cell scheduling with pick-up constraints and uncertain processing times. IISE Transactions, 51(11), 1217-1235. https://doi.org/10.1080/24725854.2018.1555727
Foumani, M., Razeghi, A., & Smith-Miles, K. (2020). Stochastic optimization of two-machine flow shop robotic cells with controllable inspection times: From theory toward practice. Robotics and Computer-Integrated Manufacturing, 61, 101822. https://doi.org/10.1016/j.rcim.2019.101822
Vaisi, B. A. H. A. R. E. H., Farughi, H., & Raissi, S. (2020). Multi-Objective Optimal Model for Task Scheduling and Allocation in a Two Machines Robotic Cell Considering Breakdowns. WSEAS transactions on information science and applications, 17, 1-8. https://doi.org/10.37394/23209.2020.17.a025103-920
Vaisi, B., Farughi, H., & Raissi, S. (2021). Utilization of response surface methodology and goal programming based on simulation in a robotic cell to optimize sequencing. Journal of quality engineering and management, 10(4), 327-338.
Vaisi, B., Farughi, H., Raissi, S., & Sadeghi, H. (2023). A bi-objective optimal task scheduling model for two-machine robotic-cell subject to probable machine failures. Journal of applied research on industrial engineering, 10(1), 141-154.
Jalali, Arash and Gholami, Saideh, 2018, Mathematical modeling of m-machine and k-unit robotic cell problem in workshop flow environment, 16th International Industrial Engineering Conference, Tehran.
Rahmani, D. (2017). A new proactive-reactive approach to hedge against uncertain processing times and unexpected machine failures in the two-machine flow shop scheduling problems. scientia Iranica, 24(3), 1571-1584. https://doi.org/10.24200/sci.2017.4136
Jalali,A and Gholami,S . (2024). Robotic Cell Scheduling with a Proactive–Reactive Approach, Considering Machine Breakdown. Journal of Industrial Engineering Research in Production Systems, 12(24), 17-33. doi: 10.22084/ier.2024.28988.2159
MLA
Jalali,A , and Gholami,S . "Robotic Cell Scheduling with a Proactive–Reactive Approach, Considering Machine Breakdown", Journal of Industrial Engineering Research in Production Systems, 12, 24, 2024, 17-33. doi: 10.22084/ier.2024.28988.2159
HARVARD
Jalali A, Gholami S. (2024). 'Robotic Cell Scheduling with a Proactive–Reactive Approach, Considering Machine Breakdown', Journal of Industrial Engineering Research in Production Systems, 12(24), pp. 17-33. doi: 10.22084/ier.2024.28988.2159
CHICAGO
A Jalali and S Gholami, "Robotic Cell Scheduling with a Proactive–Reactive Approach, Considering Machine Breakdown," Journal of Industrial Engineering Research in Production Systems, 12 24 (2024): 17-33, doi: 10.22084/ier.2024.28988.2159
VANCOUVER
Jalali A, Gholami S. Robotic Cell Scheduling with a Proactive–Reactive Approach, Considering Machine Breakdown. IERPS. 2024;12(24):17-33 (In Persian). doi: 10.22084/ier.2024.28988.2159